Scaffolding Components
Scaffolding Components
Standards:
A standard is the long pipe or tube running vertically that connects the mass of the scaffold directly to the ground. The base of each standard is connected to a base plate, or sill, which helps distribute the weight each standard bears. As standards are of fixed lengths, taller scaffolding requires that the pipes be connected so as to route the load directly through the structure. This is accomplished by way of a pin and socket joint which twists to lock successive pipes together.
For more information, please visit Gongde.
Pairs of standards are placed at the back of the scaffolding (nearest the building) and at the front of the scaffold, the two pairs of standards forming a bay that has a width (back-to-front dimension) and length (side-to-side dimension).
The standards, also called uprights, are the vertical tubes that transfer the entire weight of the structure to the ground where they rest on a square base plate to spread the load.
Tubes are usually made either of steel or aluminum; although there is composite scaffolding which uses filament-wound tubes of glass fiber in a nylon or polyester matrix, because of the high cost of composite tube, it is usually only used when there is a risk from overhead electric cables that cannot be isolated. If steel, they are either 'black' or galvanized. The tubes come in a variety of lengths and a standard outside diameter of 48.3 mm. (1.5 NPS pipe). The chief difference between the two types of metal tubes is the lower weight of aluminum tubes (1.7 kg/m as opposed to 4.4 kg/m). However they are more flexible and have a lower resistance to stress. Tubes are generally bought in 6.3 m lengths and can then be cut down to certain typical sizes. Most large companies will brand their tubes with their name and address in order to deter theft.
Galvanized steel scaffold tube is the main scaffolding part which creates the framework and the base for working platforms. Scaffold tubes are made from galvanized steel, are heavy duty and come in various lengths ranging from 5ft to 21ft and all have a different part to play.
In general 21 foot or 6.4 meter tubes are used as the upright standards and these are one of the main components that connects most of the scaffolding together. Standards are placed in a vertical position from the ground up on to a baseplate which is a scaffolding part that helps spread the weight.
For general scaffolding works e.g. painting and decorating, each upright standard should be placed a maximum of 2 meters apart. For heavy duty works where there is a heavy load going to be placed on the working platform then the standards should be a very maximum distance of 1.8 meters apart and this is generally called the bay length.
If you are looking to erect scaffolds higher than 21ft then the standards would need to be connected on top of one another using a joint pin scaffolding part which is inserted into the inner tube which then locks the uprights together.
To create a scaffolding bay you would need the following scaffolding parts, two pairs of standards, one should be close to the building and is usually referred to as the inside standard or upright. The next standards would be placed directly opposite the inside uprights and are usually called the outside standards which then creates the bay. The width and length dimensions of each bay may vary depending on what types of scaffold you require.
Thickness of tubes: measure the inside wall and regardless of the length most galvanized tube measures in at 4mm in thickness.
Scaffolding tubes diameter: you need to measure the outside of the tube from edge to edge. You will find most type 4 tubes no matter what length they are have a diameter which is usually 48.3mm or 1.90 inches.
STANDARD-DIFFERENT TYPE OF DAMAGES
The galvanizing process: is pretty simple, when the poles are manufactured the metal is sealed from all corrosion and oxidation. The steel poles are hot dipped in to a bath of molten zinc at temperatures exceeding 800 degrees Fahrenheit adding a bonded coating to the steel for extra protection.
These poles have been put through the galvanizing process to ensure that they are environmentally friendly and also strong and hard wearing, resistant to rust and have an increased life span. Buying steel scaffold tube is slightly more expensive than other poles available and this is due to the galvanizing, however you will save your money in the long run as these steel tubes will require far less maintenance or replacing.
Every Scaffold and every member or component thereof shall be:
- Metal having adequate strength & Free from defects
- Suitable and safe for the purpose for which it is intended.
- Scaffold Supervisor shall carry out monthly inspection of all the materials required for scaffold and
- immediately replace the damaged materials, if any.
- HSE coordinator shall carry out quarterly audit of Scaffold Material along with Scaffold Supervisor.
- Scaffold Contractor has to change the Scaffold material if when asked by the HSE department.
- Flame cut tube, Cross cut tube, Mushroom Head Tube, Spilt End Tube, Bent Tube, Welded Tube, Rusted Tube, not consider as a scaffold tube. Refer to below image
Ledgers:
In between each standard, running horizontally along the length of the scaffold, is a ledger or runner or cross beam, which adds further support and weight distribution. Multiple bays are connected with these ledgers both at the back and the front of the scaffold. Placement of ledgers defines the height at which the worker platforms are staged (except for the lowest one which is placed near the ground).
For more information, please visit Steel scaffold boards.
Suggested reading:Why EN74-1 Scaffolding Pressed Sleeve Coupler Matters
How to Choose the Perfect Custom Side-blown Smelting Furnace?
The Benefits of Using Industrial Side-blown Furnace Service for Enhanced Efficiency and Productivity
What to Consider When Choosing an Industrial Battery Crusher Trader?
Understanding the Chemical Fuming Furnace Process
Key Questions to Ask When Choosing Commercial Solar Panel Installation Services
Building a Custom Lithium Battery Recycling Plant
Joints in ledgers should also be staggered, i.e. joints in adjacent ledgers should not occur in the same bay. These joints should be made with sleeve couplers and not be more than one-third distance away from a points in ledgers on the same lift and in adjacent lifts should not occur in the same bay unless there is unjointed guardrail (not to be removed) when joints in the ledgers above and below can be in the same bay.
The spacing of ledgers (lift heights) will be:
independent tied scaffolds 2.0m
putlog scaffolds 1.35m
Some types of system scaffold do not require ledger/cross bracing unless:
- ties cannot be located as required by the manufacturer or are liable to be removed; or
- the height of the scaffold is 4m or more above the last line of ties.
Where ledger bracing is installed for the above reasons, the loads on the adjacent ties will be increased. The system manufacturers instructions should be consulted to determine whether ledger bracing is required.
Ledger bracing should be installed on tube and fitting scaffolds. Brace alternate pairs of tube and fitting standards, ensuring that the bracing forms a complete series of triangles from bottom to top of the scaffold. Install the bracing from ledger to ledger or from standard to standard. For tube and fitting scaffolds, brace each pair of standards where the bracing is installed from the inside ledger to the guard-rail of the lift below to allow access along a boarded lift.
When clear access is required on base lifts of tube and fitting scaffolds, the cross bracing may be omitted on the base lift provided the first lift does not exceed 2.7m, or the lift is knee braced. In either case, the loading capacity of the scaffold will be reduced.
For more Scaffolding Steel Propinformation, please contact us. We will provide professional answers.
The Advantages of Implementing Solar-Powered Home Heating Systems
4 Tips to Select the Best Portable Water Purification System
Key Questions to Consider When Selecting Industrial Hot Water Heater Installation Services
How to Select Effective High-Temperature Fuming Furnace Maintenance?
The Advantages of Implementing Eco-Friendly Packaging Solutions
Metal Melting Furnace - SuperbMelt
Noritz Acquires PB Heat